Tackling the productivity challenge
|
| Construction work at Heathrow |
This article was originally published on 31 January 2020 by the Institution of Civil Engineers following a roundtable with industry leaders. It was written by Joseph Marner, MEng (Hons) GMICE, Engineer/President's Future Leader.
Contents |
[edit] Introduction
In general terms, productivity is the amount of output produced per unit of input, so it’s an indicator of efficiency. However, monitoring, measuring and increasing productivity in practical terms is not so simple.
[edit] Why worry about productivity?
In 2018, the UK construction industry generated £117bn of economic output which represented 6% of the UK's total GDP. By sector, 'infrastructure' orders were worth £11.5bn and 'commercial' orders valued at £15.2 bn. These numbers alone demonstrate the economic scale of the built environment industry. It’s clear to see that when we talk about infrastructure productivity the stakes are high. The problem, though, is that UK construction productivity lags behind most other major sectors (as measured by the Office of National Statistics). Looking outwards, the UK economy as a whole is less productive than all but one of the other G7 nations. So, there are improvements to be had. But if we don’t interrogate the problem then we can’t fix it.
[edit] What's stopping us from increasing productivity now?
You could increase productivity by making many incremental improvements. Small steps can only get you so far, though. It’s like being half-way up a mountain, trying to get to the highest point in the mountain range. You'll eventually get to the top of your mountain by taking many small steps towards higher ground. But if your goal is to get to the highest point in the whole range, it's likely that you'll need to get onto a different mountain. This holds true for productivity.
The consensus among the industry leaders present at the ICE roundtable was that we won’t achieve the productivity increases we’re aiming for if we continue to rely on incremental improvements. What we need is a revolution in how we do things - we need to get onto a higher mountain. This is difficult in an industry as large and as complex as ours, and where the profit margins for businesses are so tight.
From the experiences shared at the roundtable, current business models don't encourage proactive steps to improve productivity. It was pointed out that under current practices, if you found a way to work twice as fast, you'd likely only be paid half as much, and few people disagreed that this is typical. Ultimately this discourages organisations from improving productivity in favour of maximising their own revenue.
The significant upfront capital investment required to develop modern methods of construction was another concern shared by many in the room. Very few organisations are currently willing - or able - to put the cash required into research and development, particularly in the context of tight margins and fierce competition. There’s not yet confidence that innovative approaches will be widely adopted.
[edit] Isn't off-site construction the answer?
Design for Manufacture and Assembly (DfMA) is a construction approach whereby as much as possible is formed of standard components built offsite in a factory setting. The parts are then assembled on site. It’s prefabrication on a large, standardised scale.
Some in the industry believe that productivity could be increased three-fold or more by using a DfMA approach. Several first-hand examples were offered up at the roundtable to support this claim. And, we might be more ready for this than you think. It wouldn't be too difficult to take designs we already have and incorporate them into a repository of standard components over the course of the first, trailblazing projects.
There’s no need to perfect a catalogue of components before we start. However, plenty of concerns about the challenges to such an approach were raised. Firstly, relying on a small set of components could be seen as anti-competitive, which presents a regulatory hurdle. There's also the question of initial investment - someone will still have to invest in the offsite production facilities initially. Issues of liability under new arrangements and ownership of any new business models also needs to be better understood. And perhaps most importantly, designers and constructors will need to embrace a radical shift in thinking in order to make the concept successful. The human aspect of the problem may be the most difficult to overcome.
[edit] So, what do we need to do to improve productivity?
Good leadership is crucial. Any move to a new way of delivering infrastructure projects - whether that be DfMA or another approach - needs a clear champion.
There was broad agreement that funders and clients are in the best position to take up this role. Funders can provide confidence that the pipeline of infrastructure projects will be sustained so that the full potential of businesses’ commitments to new methods can be realised. Clients then need to drive the changes in approach and methods.
The right questions need to be asked at tender stage, and ways to increase productivity need to be incentivised. New approaches need to be embedded from the very beginning. Everyone agreed that consistency – in every sense – is also key. We need to be consistent in how we define productivity and measure improvements.
Our methods and the outputs we produce need to be compatible across industry sectors, geographies and clients. And we need to be consistent in approach across all projects. What was clear to me, though, is that achieving even small percentage increases in productivity will take massive effort across our industry, at all levels. I look forward to seeing and being part of whatever new approaches are adopted.
This article was originally published on the infrastructure blog on 31 January 2020 by the Institution of Civil Engineers following a roundtable with industry leaders. It was written by Joseph Marner, MEng (Hons) GMICE, Engineer/President's Future Leader.
--Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.